Evaluate control chart and process metrics using spc methods


Homework: Statistical Process Control Methods

Purpose of Homework

The purpose of this Homework is for students to learn how to apply Statistical Process Control Methods to a business process.

Homework Steps

Select a complex continuous process from your personal life or work. The process can be the same as in Homework.

Complete the following:

a) Use Microsoft Excel to calculate the defined process metrics including variation and process capability.

b) Use Microsoft Excel and PowerPoint to develop and display a control chart for the process.

1. Evaluate the control chart and process metrics using Statistical Process Control (SPC) methods.

2. Evaluate whether the process could benefit from the use of Six Sigma tools.

3. Develop a 525 words executive summary in which you describe your Statistical Process Control project and include the control chart with SPC.

Format your homework according to the give formatting requirements:

1. The answer must be double spaced, typed, using Times New Roman font (size 12), with one-inch margins on all sides.

2. The response also includes a cover page containing the title of the homework, the course title, the student's name, and the date. The cover page is not included in the required page length.

3. Also include a reference page. The references and Citations should follow APA format. The reference page is not included in the required page length.

Solution Preview :

Prepared by a verified Expert
Applied Statistics: Evaluate control chart and process metrics using spc methods
Reference No:- TGS03025971

Now Priced at $45 (50% Discount)

Recommended (99%)

Rated (4.3/5)