A town of 100,000 people wants to construct a landfill on the site shown in Figure 4-24. Design such a landfill. Estimate the life of the landfill, and specify the equipment to be used, the method of operation, and other considerations necessary for acceptable operation. Draw in roads and any permanent installations on the map.