Enter the letters of the items needed to compute that variance on the line in front of each variance. You can enter more than one item on each line as applicable.
A-) Standard overhead allocated to production
B-) Flexible budget overhead for actual number of outputs
C-) Actual variable overhead cost
D-) Fixed overhead costs
________ Manufacturing overhead (MOH) flexible budget variance
________ Production volume variance