FINAL PROJECT DESCRIPTION
Create a Logo!
- Graded on creativity
- Submit Drawing Template (.dwt) File for grading
Import Conveyor .step file
- Use 3d Rotate and 3d Move to orient the conveyor as shown
Missing Components
- Bearings/Bearing housing (6 total)
- Pulleys (3 total)
- Belts (2 total)
Challenge!
- Create pulley/belt configuration to generate linear
conveyor travel speed = 1.5 - 2.0 feet per second.
- Motor RPM = 1600
- Calculate any unknown pulley diameters (pulley calc. optional)
- Generate 3D CAD models for the following
- Bearing housing
- Pulley (3 total)
- Shaft (1 + pulley)
- Belts (2 total)
- Create Orthographic Projection View Drawings for each using logo template
Required to Submit...
LOGO
- Submit .dwt file
- Use in required drawings
Bearing Housing (3d model, .dwg file)
Pulley II, III, IV (3d model, .dwg file)
Shaft (3d model, .dwg file)
Belts (3d model, .dwg file)
Bearing Housing (Orth Proj, dims/tols/gd&t, .pdf file)
Pulley II, III, IV (Orth Proj, dims/tols/gd&t, .pdf file)
Shaft (Orth Proj, dims/tols/gd&t, .pdf file)
Belts (Orth Proj, dims/tols/gd&t, .pdf file)
Attachment:- FinalProject.pdf