Ensure data between different systems interfaces


Discussion:

Final phase of the system implementation that results in the acceptance, rejection, or modification of the project, and release, suspension, or deduction of the contracted amount to the vendors-system maintenance. Compose a brief (2-page) summary of how you will:

• Ensure that all hardware work together.

• Ensure that every function of every application of the computer system works and the system meets the functional requirements and the RFP specifications.

• Ensure that data between different systems interfaces and is transferred smoothly and in correct format.

• Ensure correct transference of data from old to new system (conversion testing).

• Ensure that the system can work under maximum load (volume/stress testing).

• Verify that the system works as expected in a live environment.

Solution Preview :

Prepared by a verified Expert
Other Subject: Ensure data between different systems interfaces
Reference No:- TGS02016573

Now Priced at $20 (50% Discount)

Recommended (91%)

Rated (4.3/5)