Elimination of waste under lean production


1) Which of the following is considered an organizational blueprint, which prescribes the quantity and time frame for when each end product will be assembled?

• MRP (Material Requirements Plan)
• ERP (Enterprise Resource Planning)
• MPS (Master Production Schedule)
• WBS (Work Breakdown Structure)

2) Which of the following is an element that addresses elimination of waste under lean production?

• Kanban production control system
• Production ahead of demand
• Minimized run times
• Group plant loading technology

3) In most cases, demand for products or services can be broken into several components. Which of the following is considered a component of demand?

• Level elements
• Future elements
• Past elements
• Cyclical elements

4) Design for manufacturing and assembly delivers product improvements by emphasizing which of the following:

• Reducing product quality during the assembly process
• Designing products so they can be manufactured by a virtual factory
• Reducing equipment in the production process
• Simplification of the product by reducing the number of separate parts

5) Which of the following is one of the principles of reengineering?

• Quality at the source
• Do not select suppliers on the basis of price alone.
• Have those who use the output of a process perform the process.
• Leverage high cost employees with lower cost employees.

Request for Solution File

Ask an Expert for Answer!!
Operation Management: Elimination of waste under lean production
Reference No:- TGS0513919

Expected delivery within 24 Hours