During november 8800 components were completed there is no


Question - Davis Company produces a common machine component for industrial equipment in three departments: molding, grinding, and finishing. The following data are available for November:

molding Grinding finishing respectively

Direct materials $143,300$15,700$10,200Direct labor13,60034,20022,800

Applied overhead 17,000135,90019,400

During November, 8,800 components were completed. There is no beginning or ending WIP in any department.

Required:

1. Prepare a schedule showing, for each department, the cost of direct materials, direct labor, applied overhead, product transferred in from a prior department, and total manufacturing cost. Refer to the key below.

2. Calculate the unit cost. (Round the unit cost to two decimal places.)

Refer to the list below for the exact wording of an amount description within your schedule.

Solution Preview :

Prepared by a verified Expert
Accounting Basics: During november 8800 components were completed there is no
Reference No:- TGS02570799

Now Priced at $25 (50% Discount)

Recommended (97%)

Rated (4.9/5)