Draw out the assignment of tasks to workstations in a


Label

Work Element

Precedence

Time (Min)

A

Align Frame on Workstation

-

4.2

B

Assemble Handle Bar

A

2.2

C

Assemble Gears and Pedals

A

2.4

D

Assemble Wheels

C

1.5

E

Tune the bicycle

B, D

1.8

Assume that the assembly line runs 40 hours per week.

Draw out the assignment of tasks to workstations in a diagram with labels. There may be a couple possible layouts so choose the one with the highest potential output

(Hint: you will need this to see the bottleneck workcenter, which determines the actual cycle time).

What is the efficiency of this assembly line?