Assignment
Risk resource structure on the ideal building and lazy river of a cable park made some points on this such as:
Types of risks
1. Construction risk
2. Compliance risk
3. Design risk
4. Environmental risk
5. Investment risk
6. Operational risk
7. Workplace health and safety risk
Note:
1. Give introduction related to the cable park where the lazy river to build and a two -story building.
2. Give the vulnerability assessment regarding the lazy river and ideal building based upon the types of risks.
3. Draw a risk assessment matrix depending upon the types of risks and mention the impacts and the show the precautionary assessment on the risks which are mentioned.