Solve the below problem:
Q: Graphically analyze the following problem:
Maximize profit = $4X + 56 Y subject to X + 2Y less than or equal to 8 hours 6X + 4Y less than or equal to 24 hours
a. What is the optimal solution?
b. If the first constraint is altered to X + 3Y lessthanorequalto 8, does the feasible region or optimal solution change?