Write the short note on the following term:
- Approach
- Economical span
- Abutment
2- Discuss the various calssification of bridge made on the various basis.
3- Out line the development of bridge.
4- Identification of bridge .
5- Write the preliminari data should be elected and for analised.
6 - Mention the various permissible velocity for different bed of river.
7- What is requirement of ideal bridge .
8- Discuss the lenth of bridge and how it will be determined.
9- What are the different method for the determination and design of a bridge.
10- How will you estimate the maximum scour depth for any bridge peir.