Primm Company produced 2,500 units of product that required three standard hours per unit. The standard variable overhead cost per unit is $2.50 per hour. The actual variable factory overhead was $19,050. Determine the variable factory overhead controllable variance. Use the minus sign to enter favorable cost variances as negative numbers.