1. Discuss the impact of the control limits on the average run length and the operating characteristic curve.
2. Explain the conditions under which a u-chart would be used instead of a c-chart.
3. Explain why a p- or c-chart is not appropriate for highly conforming processes.
4. Distinguish between 3σ limits and probability limits. When would you consider constructing probability limits?