Discuss the challenges of producing a system with leading


Consider the technology cycle times shown in the figure below.

a. Discuss the challenges of producing a system with leading edge technology while conducting systems integration and meaningful independent testing.

b. Military systems often take 15 years or longer from conception to fielding. Discuss the use of modularity as a key performance parameter for assessing platform designs.