1. List the seven steps, beginning with “Defining the Problem,” that an operations manager should perform when using simulation to analyze a problem.
2. Discuss some of the dos and donts of salary negotiations.
3. Demand management in MRP II is handled in __________________.
A. Master Production Scheduling Module B. Production smoothing C. Lead times D. Flow times