The last part that is missing is the DMAIC process (define, measure, analyze, improve, control); we need to devise a plan to maintain and control the process moving forward. The final concluding section should summarize the DMAI, and further discuss how we will Control the results and measure continued success.
Attachment:- 523132_1_1-PAGE-DMAIC.docx