Heersink Corporation bases its predetermined overhead rate on variable manufacturing overhead cost of $10.50 per machine-hour and fixed manufacturing overhead cost of $108,108 per period. If the denominator level of activity is 2,700 machine-hours, the fixed element in the predetermined overhead rate would be?