Problem: The diffusion of change using a pilot project is more likely to succeed when:
Multiple Choices:
- All of these exist.
- The pilot study was successful.
- None of these exist.
- Employees are provided with adequate resources and time to adopt the practices demonstrated in the pilot project.
- Employees have the ability -required skills and knowledge to adopt the practices introduced in the pilot project.