Assignment: Statistical Process Control Methods
Select a complex continuous process from your personal life or work. The process can be the same as in Week 1 assignment.
Complete the following:
• Use Microsoft Excel to calculate the defined process metrics including variation and process capability.
• Use Microsoft Excel and PowerPoint® to develop and display a control chart for the process.
Evaluate the control chart and process metrics using Statistical Process Control (SPC) methods.
Evaluate whether the process could benefit from the use of Six Sigma tools.
Develop a 525-word executive summary in which you describe your Statistical Process Control project and include the control chart with SPC.
The response should include a reference list. Double-space, using Times New Roman 12 pnt font, one-inch margins, and APA style of writing and citations.