Julio produces two types of calculator, standard and deluxe. The company is currently using a traditional costing system with machine hours as the cost driver but is considering a move to activity-based costing. In preparing for the possible switch, Julio has identified two cost pools: materials handling and setup. The collected data follow:


Standard Model Deluxe Model
  Number of machine hours 32,500
35,000
  Number of material moves 380
580
  Number of setups 70
475

Total estimated overhead costs are $263,000, of which $110,400 is assigned to the material handling cost pool and $152,600 is assigned to the setup cost pool.

 