Devise a preliminary control scheme for the sections of the nitric acid plant described in Chapter 2, flow sheet Figure 2.8, which are listed below. Make a practice HAZOP study of each section and revise your preliminary control scheme.
a. Waste-heat boiler (WHB)
b. Condenser
c. Absorption column