Homework: Management Operation
Consider a recent project that you have worked on. This could be for a company or organization with which you are familiar, or even a personal project such as purchasing a home or planning a party.
After your opening paragraph, which includes your thesis statement, identify your selected company or organization in no more than three paragraphs. Then, complete the following:
I. Create either a Work Breakdown Structure (WBS) of the project or Gantt Chart for planning and scheduling the project. Discuss why you used the type of chart you did.
II. Determine and document both probabilistic (t0, tp, and tm) and deterministic time estimates. Discuss how you arrived at these time estimates.
III. Using MS Word, Google Docs, or similar software, create a PERT network diagram with the Critical Path (CP) identified.
IV. Calculate the slack time for each activity. Discuss the ramifications of slack in the CP for the activities and the project as a whole.
V. Develop the network diagram from the probability estimates. Discuss which path you would take and why.
VI. For each activity, determine hypothetical costs in a table. Include budgeted costs, percent complete, actual/projected cost, and over/under budget (and total). Discuss the rationale for how you derived these costs.
VII. Crash an activity on the Critical Path. Discuss the ramifications of crashing the activity you crashed.
Format your homework according to the give formatting requirements:
1. The answer must be double spaced, typed, using Times New Roman font (size 12), with one-inch margins on all sides.
2. The response also includes a cover page containing the title of the homework, the course title, the student's name, and the date. The cover page is not included in the required page length.
3. Also include a reference page. The references and Citations should follow APA format. The reference page is not included in the required page length.