In a dried nuts company, there are two type of nuts, peanut and nut. The processing time of the nut is takes 1.5 times longer than peanut. The daily demand of is 200 kg of peanut and 300 kg of nuts. If the company only produces peanuts, it can produce 450 kg. Peanuts price is 10 TL and nuts price is 7 TL. In order to maximize the profit, develop the mathematical model.