Develop production constraints for work area


A manufacturer makes two products, doors and windows. Each must be processed through two work areas. Work area #1 has 60 hours of available production time. Work area #2 has 48 hours of available production time. Manufacturing of a door requires 4 hours in work area #1 and 2 hours in work area #2. Manufacturing of a window requires 2 hours in work area #1 and 4 hours in work area #2. Profit is $8 per door and $6 per window.
a. Define decision variables that will tell how many units to build (doors and windows)
b. Develop an objective function that will maximize profits.
c. Develop production constraints for work area #1 and #2.

Request for Solution File

Ask an Expert for Answer!!
Basic Statistics: Develop production constraints for work area
Reference No:- TGS0113305

Expected delivery within 24 Hours