--%>

Develop complete work breakdown structure for a gas station


Question:

Develop a complete work breakdown structure for a small gas station project for which simplified plans and concept drawings are attached at the end of this document. Table 1 provides work units that need to be finished to complete the project. Develop work packages and include the respective work units as a secondary level of the WBS. Develop a unique numeric tracking system for work packages and work units. Draw an AON diagram properly sequencing the construction of the primary work packages (e.g., 1st level of the WBS).

 

Request for Solution File

Ask an Expert for Answer!!
Other Subject: Develop complete work breakdown structure for a gas station
Reference No:- TGS03397265

Expected delivery within 24 Hours