Develop a work breakdown structure wbs for each of your two


Develop a work breakdown structure (WBS) for each of your two or three alternative solutions to your performance problem.The link at the end of this paragraph leads to the IT Economics WBS reading, which includes an explanation of how to develop a WBS and illustrations of work breakdown structures.The illustrations can serve as a model for your preparation of Activity 5. The explanation and illustrations should give you an idea of the level of detail appropriate for the WBS required for each of your two alternative solutions. The reading is available at:https://www.iteconcorp.com/T5WorkBreakdownStructure.htm 