--%>

Develop a work breakdown structure wbs for a project to


Develop a work breakdown structure (WBS) for a project to build a new park in Southfield, Mi. The WBS should have at a minimum 4 levels and should cover all areas associated with designing, developing and opening a new park. The park will sit on 52 acres and will have a pavilion, restrooms, lighted baseball diamond, lighted tennis courts, slides, swings, nature trail, volleyball nets, small kids play area, parking lot, limited road access, lighting, drinking faucets, exercise trail, and walking paths in the woods. Complete the assignment using Visio, Microsoft Power Point, or some other electronic drawing tool.

Request for Solution File

Ask an Expert for Answer!!
Operation Management: Develop a work breakdown structure wbs for a project to
Reference No:- TGS01530620

Expected delivery within 24 Hours