Develop a work breakdown structure wbs for a project to


Develop a work breakdown structure (WBS) for a project to build new student housing for 150 students on campus at LTU in Southfield, Mi. The WBS should have at a minimum 5 levels and should cover all areas associated with designing, engineering, constructing, inspecting, and opening the new student housing. The new student housing will have an outdoor swimming pool,common area to hang out, 75 dorm rooms, gym room, lighting, landscaping, storage units, a gym, and high tech security. Complete the assignment using Visio, Microsoft Power Point, or some other electronic drawing tool.