--%>

Develop a work breakdown structure for the project


Project Homework: WBS- Manage Your Health

Instructions:

a. Develop a work breakdown structure (WBS) for the project. Break down the work to Level 3 or Level 4, as appropriate. Use the MS Word template "WBS Template" provided as a guides. NOTE: Be sure the WBS is based on the project charter (created for the Individual Project: Charter homework).

b. Use the WBS you developed using the "WBS Template" to create your WBS in MS Project. Make sure the Gantt chart is displayed within the MS Project. Durations and dependencies can be used. Be sure to go into depth with your project plan. Task-level details should include resources, owners, time estimations, and cost estimations, etc. Financial analysis should include calculations like NPV or similar methodology.

c. WBS Word Document Outline Template

d. WBS MS Project Document containing both the WBS and Gantt Chart

Format your homework according to the give formatting requirements:

a. The answer must be double spaced, typed, using Times New Roman font (size 12), with one-inch margins on all sides.

b. The response also includes a cover page containing the title of the homework, the course title, the student's name, and the date. The cover page is not included in the required page length.

c. Also include a reference page. The references and Citations should follow APA format. The reference page is not included in the required page length.

Request for Solution File

Ask an Expert for Answer!!
Project Management: Develop a work breakdown structure for the project
Reference No:- TGS03130895

Expected delivery within 24 Hours