--%>

Develop a work breakdown structure


Assignment: The Wedding Case

CASE QUESTIONS

1. Make a list of assumptions that will be used as the basis for planning the wedding. And no, it is not acceptable to assume that Tony and Peggy Sue will just elope, no matter how tempting that may be!

2. Develop a work breakdown structure.

3. Make a list of the specific activities that need to be done between now and the wedding day.

4. For each activity, identify the person (Tony, Peggy Sue, and so forth) who will be responsible for seeing that the activity is accomplished.

5. Create a network diagram that shows the sequence and dependent relationships of all the activities.

Format your assignment according to the following formatting requirements:

1. The answer should be typed, double spaced, using Times New Roman font (size 12), with one-inch margins on all sides.

2. The response also includes a cover page containing the title of the assignment, the student's name, the course title, and the date. The cover page is not included in the required page length.

3. Also include a reference page. The Citations and references should follow APA format. The reference page is not included in the required page length.

Solution Preview :

Prepared by a verified Expert
Other Subject: Develop a work breakdown structure
Reference No:- TGS02979858

Now Priced at $35 (50% Discount)

Recommended (96%)

Rated (4.8/5)