Develop a wbs for brians project


Assignment: Strategic Management

Read the Case "Advantage Energy Technology Data Center Migration" at the end of the chapter 6 and response to the following questions:

• Generate a priority matrix for AET's system move.

• Develop a WBS for Brian's project. Include duration (days) and predecessors

• Using a project planning tool, generate a network diagram for this project.

Note: Base your plan on the following guidelines: eight-hour days, five-day weeks except for when Brian moves the network components over a weekend, no holiday breaks, March 1, 2010, is the project start date. Ordering Ventilation System, New Racks, and Power Supplies/Cables takes only one actual day of work. The remaining days are the time necessary for the vendors to fill and ship the order to Brian. So use Finish to Start lags here. Assume that five days after the start of the Renovation of the Data Center that the raised floor will be ready for inspection (a Start-to-Start lag).

Format your assignment according to the give formatting requirements:

• The answer must be using Times New Roman font (size 12), double spaced, typed, with one-inch margins on all sides.

• The response also includes a cover page containing the student's name, the title of the assignment, the course title, and the date. The cover page is not included in the required page length.

• Also include a reference page. The references and Citations should follow APA format. The reference page is not included in the required page length.

Solution Preview :

Prepared by a verified Expert
Strategic Management: Develop a wbs for brians project
Reference No:- TGS03048126

Now Priced at $15 (50% Discount)

Recommended (94%)

Rated (4.6/5)