The relationship between people and time is highly nonlinear. Using Putnam's software equation (described in Section 27.2.2), develop a table that relates number of people to project duration for a software project requiring 50,000 LOC and 15 person-years of effort (the productivity parameter is 5000 and B 0.37). Assume that the software must be delivered in 24 months plus or minus 12 months.