• Develop a Risk Watch List for a program or project you are working on or one with which you are familiar.
• Include, if possible, a risk for each of the following categories: technical, cost, schedule, programmatic/external.
• Develop at least two potential solutions/actions for each risk that is listed.
• Calculate the current levels if possible - #1 is low, #10 is high.
• Use the format provided on page 627-10-12 in your Study Reference Guide.