Develop a resource management plan for the anchorage


Assignment:

You will complete 4 project assignments in response to the provided scenario. You may have to build a small project plan, and make some assumptions. Each project submission must follow current PMBOK guidelines. Each submission must include 1 biblical integration summary that ties the current week topic back to Biblical project management. In your introductions and section summaries you will reference the textbook and other scholarly articles. I expect to see this cited and a reference page added in APA format. No other APA formatting is required as I expect you to utilize list, tables, charts, etc. to complete each document. Remember that this is a project document, search the internet for examples to get a look and feel for each, then follow PMBOK to build your documents. The 4 parts of this project are:

1. Project: Resource Management Plan-Utilizing PMBOK, the course text, and the discussion with your classmates in Modules/Weeks 1-2, develop a Resource Management Plan for the Anchorage, AK Technology Project. Use PMBOK as your guide to what to include.

2. Project: Communication Plan-Utilizing PMBOK, the course text, and the discussion with your classmates in Modules/Weeks 3-4, develop a Communication Plan for the Anchorage, AK Technology Project. Use PMBOK as your guide to what to include.

3. Project: Risk Register and Risk Management Plan-Utilizing PMBOK, the course text, and the discussion with your classmates in Modules/Weeks 5-6, develop a Risk Register and Risk Management Plan for the Anchorage, AK Technology Project. Use PMBOK as your guide to what to include.

4. Project: Procurement Management Plan-Utilizing PMBOK, the course text, and the discussion with your classmates in Modules/Weeks 7-8, develop a Procurement Management Plan for the Anchorage, AK Technology Project. Use PMBOK as your guide to what to include.

 

ALL PLANS REQUIRE Alaska project information AND cited/reference materials to support your knowledge of these plans. A reference page isrequired.

THE OUTLINE FOR THESE PLANS can be found in PMBOK on the following pages:

1. Hunan Resource Management Plan -

2. Communications Management Plan -

3. Risk Management Plan  AND a Risk Register for the Alaska project is explained in chapter. This should be a TABLE that includes the risk description, probability, impact, mitigation plan, and owner inserted into this plan

4. Procurement Management Plan - Page 366 section 12.1.3.1

Think about how you can display the data in a way that is easy to read and makes sense. Tables, list graphics are all good. These plans are read by anyone looking for quick information. Can they get this from paragraphs?

Project Assignment

Scenario

You have been assigned to the Project Manager role for a project in Anchorage, Alaska where it snows 12" daily (or so it seems), and sometimes reduces air traffic to 1 flight in and 1 flight out daily.

The city wishes to upgrade its technology center with current hardware and software, and hand off 24-hour phone support to a vendor based in India. The core project team is located in Anchorage and consists of the following:

The Project Sponsor is the Mayor, Dan Sullivan.

In addition to the mayor, you have the current technology director and 4 technicians.

The Technology Director is Mitch Stevens. Mitch is very knowledgeable and knows the current center inside and out. He is an introvert who stores everything in his head and loves to hunt.

The 4 Technicians are Brad (new to the team), Katie (a 5-year veteran who is 5 months pregnant), and Bob and Mick (local college students).

The Procurement Team is located in Juno. As it supports the entire state, they stay busy procuring for everyone.

All hardware will be made to order and is to be built by Dell.

Juno is in the middle of their city technology center upgrade and may have enough hardware to cover Anchorage, as they changed plan mid-project. However, you won't know for another month or 2 what, if anything, may be available.

COTS software will be used where possible, but there is 1 application that connects all units in the building which has not yet been developed.

The Development and Testing Teams are located in Delhi, India.

Their lead team Project Manager is Kumar, and he is located in Alaska with you. He will also be the lead for the support team that needs to be assembled and trained, but those contracts have not yet been signed. You will need to make sure this happens.

The project will be completed in 6 months and cost $500k and is scheduled to start in 1 month. You will need to create a high level project plan (Resuiremtns, Design, Build,Test, and Release) to support you work, add resources and cost (assumed - this is not graded) to each section, to support your work. Use this timeline.

Req - 1 month

Design - 2 months

Build - 2 month

Test - 3 wks

Release 1wk

Solution Preview :

Prepared by a verified Expert
Project Management: Develop a resource management plan for the anchorage
Reference No:- TGS02047360

Now Priced at $50 (50% Discount)

Recommended (98%)

Rated (4.3/5)