Create a 10-slide visual presentation, with speakers' notes, that outlines the components of a receiving inspection plan.
Select a commodity to use as your example. Possible commodities include:
• Electrical components used in smartphone assembly
• Bulk food products, such as grains and liquids
• Mechanical components for industrial tool manufacturing
• Wiring components used in aerospace manufacturing
• Textiles used in clothing manufacturing
Develop a receiving inspection plan for suppliers of the selected commodity based on the following criteria:
• Newly sourced supplier
• Existing sourced supplier
Analyze why this criteria is important to the receiving inspection plan strategy.
Assess the critical inspection elements to be considered when developing the plan, including the following:
• Incoming lot inspections
o Sampling
o Frequency
o Lot containment
o Data management
o Special handling considerations
o Supplier notifications
• Disposition of non-conforming material
o Supplier returns
o Scrap
o Sorting
Include a process map of the incoming receiving inspection process.