Develop a project network consisting of at least twenty step


Assignment

1. Develop a project network consisting of at least 20 steps that should be done to complete the project. As the case suggests, keep the level of detail for these activities general, rather than specific. Be sure to indicate some degree of precedence relationship among the activities.

2. Suppose you now wanted to calculate duration estimates for these activities. How would you make use of the following approaches? Are some more useful than others?

o Expert opinion
o Past history
o Mathematical derivation.

Format your assignment according to the following formatting requirements:

1. The answer should be typed, double spaced, using Times New Roman font (size 12), with one-inch margins on all sides.

2. The response also includes a cover page containing the title of the assignment, the student's name, the course title, and the date. The cover page is not included in the required page length.

3. Also include a reference page. The Citations and references should follow APA format. The reference page is not included in the required page length.

Attachment:- Template.rar

Request for Solution File

Ask an Expert for Answer!!
Computer Networking: Develop a project network consisting of at least twenty step
Reference No:- TGS03023842

Expected delivery within 24 Hours