Develop a network schedule for your


You must submit both sections as separate files for the completion of this assignment. Label each file name according to the section of the assignment for which it is written. Additionally, you may create and / or assume all necessary assumptions needed for the completion of this assignment.

Section 1: MS Project Exercise

Update the project schedule in MS Project to account for the following changes:

1. Develop a network schedule for your project using either the arrow diagramming method or the precedence method.

2. Conduct a forward pass, and identify the critical path and total float.

Section 2: Project Performance Paper

Write a six to eight (6-8) page paper in which you:

3. Summarize your project. Note: Your summary should include, but not be limited to, the project's key objectives, projected costs and resources, and high-level timeline.

4. Create a responsibility assignment matrix (RAM) for your project, and justify your response.

5. Outline the network schedule for your project. Include a narrative description of your network schedule.

6. Analyze the critical path of your project, and discuss the total float in the project. Next, suggest the primary measures that you would use in order to manage the critical path and reduce the float in the project.

7. Determine at least two (2) best practices from the PMBOK textbook that you would apply in order to manage the project schedule. Justify your response.

8. Use at least three (3) quality references. Note: Wikipedia and other Websites do not quality as academic resources.

Your assignment must follow these formatting guidelines:

Be typed, double spaced, using Times New Roman font (size 12), with one-inch margins on all sides; references must follow APA or school-specific format. Check with your professor for any additional instructions.

Include a cover page containing the title of the assignment, the student's name, the professor's name, the course title, and the date.

The cover page and the reference page are not included in the required page length.


Attachment:- New WinRAR archive.rar

Solution Preview :

Prepared by a verified Expert
Business Management: Develop a network schedule for your
Reference No:- TGS01161031

Now Priced at $40 (50% Discount)

Recommended (99%)

Rated (4.3/5)

A

Anonymous user

4/29/2016 2:27:47 AM

Write your response in a word paper by using the Arial Black font all along with the APA formatting. Question 1: Build up a network schedule for your project by employing either the arrow diagramming method or the precedence method. Question 2: Perform a forward pass and Recognize the critical path and total float. Question 3: Sum up your project. Note: Your summary must comprise, however not be limited to, the project's main objectives, projected costs and resources and high-level timeline. Question 4: Prepare a responsibility assignment matrix (RAM) for your project and rationalize your response. Question 5: Draw the network schedule for your project. Comprise a narrative explanation of your network schedule. Question 6: Examine the critical path of your project, and describe the total float in the project. Next, propose the main measures that you would make use of in order to supervise the critical path and decrease the float in the project.