Develop a migration plan to move all current infrastructure


Assignment: Migration from Local to Cloud Infrastructure

You company has been allocated an unlimited budget to move to a virtualization infrastructure. The current IT infrastructure exists on bare metal with no virtualization implemented at all.

The current infrastructure contains the following components:

2 x Windows 2008 R2 Domain Controllers
2 x Exchange 2013 Servers
1 x SQL 2012 Server
1 x Red Hat 7.0 Apache Server
2 x Windows 2008 R2 Servers as File Servers

Your task is to do the following:

• Provide a cost and description of the new hardware you will be implementing

• Develop a migration plan to move all current infrastructure to virtualization (this also means 0 downtime)

• Identify and Upgrade the old operating systems and software in the current infrastructure

• Expand the current infrastructure to include new technologies (eg. An MDM solution)

Format your assignment according to the following formatting requirements:

(1) The answer should be typed, double spaced, using Times New Roman font (size 12), with one-inch margins on all sides.

(2) The response also includes a cover page containing the title of the assignment, the student's name, the course title, and the date. The cover page is not included in the required page length.

(3) Also include a reference page. The Citations and references should follow APA format. The reference page is not included in the required page length.

Request for Solution File

Ask an Expert for Answer!!
Computer Engineering: Develop a migration plan to move all current infrastructure
Reference No:- TGS03093962

Expected delivery within 24 Hours