Develop a design using modeling tools


Assignment

You were first asked to select a system or software application to specify requirements, develop a design using modeling tools, formulate development and testing strategies, and propose an integration and deployment plan. Each week, you contributed with specifications and plans that culminated in an overall Key Assignment System Requirements, Design, and Implementation Specification as follows:

Part 1 Tasks (Objectives from Week 1-4)

• System and Application Overview: An overview of the system or software application and intended users

• Requirements Specification: Detailed requirements specification with both functional and nonfunctional requirements

• System and Application Design: A high-level design in the form of use cases and detailed design models utilizing computer-aided software engineering (CASE) tools to represent the data, processes, and interfaces

• Test and Quality Assurance Plan: A test and quality assurance plan that included the various tests and quality control measures that need to be taken into consideration

• Development Strategy: A development strategy that weighs make versus buy or insourcing versus outsourcing acquisition strategies

Make any updates to the first 4 weeks' content based on feedback from your instructor and your peers. Make sure that the Key Assignment has a good flow and is cohesive in its presentation of information.

Part 2 Tasks (Objectives from Week 5)

You are given the assignment to craft an integration and deployment plan for your selected application or system that includes the required resources and work breakdown structure of implementation tasks (you may use Visio Software Application where needed).

The project deliverables are as follows:

• Update the System Requirements, Design, and Implementation Specification title page with the new date.

• Update the previously completed sections based on the instructor's and peers' review feedback.

• Integration and Deployment Plan

o Develop an overall work breakdown structure (WBS) for the 7 system development life cycle (SDLC) phases:

- Preliminary Analysis
- System Analysis or Requirements Definition
- System Design
- Development
- Integration and Testing
- Acceptance, Installation, and Deployment
- Operation Support and Maintenance

o Add activities under the first 5 phases that you already performed in Weeks 1-4.

o Add activities that are specific to the final 2 phases in SDLC for deployment and ongoing maintenance and support.

Format your assignment according to the following formatting requirements:

1. The answer should be typed, double spaced, using Times New Roman font (size 12), with one-inch margins on all sides.

2. The response also include a cover page containing the title of the assignment, the student's name, the course title, and the date. The cover page is not included in the required page length.

3. Also Include a reference page. The Citations and references should follow APA format. The reference page is not included in the required page length.

Request for Solution File

Ask an Expert for Answer!!
Other Subject: Develop a design using modeling tools
Reference No:- TGS02082899

Expected delivery within 24 Hours