Assignment:
Six jobs are to be processed through a two-step operation. The first operation involves sanding, and the second involves painting. Processing times are as follows:
Determine a sequence that will minimize the total completion time for these jobs. Illustrate graphically.
Provide complete and step by step solution for the question and show calculations and use formulas.