Jones Inc. calculates its predetermined overhead rate yearly on the basis of machine hours. At the starting of the year it estimated that its net manufacturing overhead would be $900,000 and the net machine hours (mh) would be 45,000. Its actual total manufacturing overhead for the year was $995,000 and its actual machine hrs were 50,000.
Determine the predetermined overhead rate for the year? Show calculations.