Determine the utilization and the efficiency for each of these situations: a. A loan processing operation that processes an average of 3 loans per day. The operation has a design capacity of 12 loans per day and an effective capacity of 10 loans per day. (Round your answer to 1 decimal place. Omit the "%" sign in your response.)