Determine the total direct materials cost variance


Response to the following problem:

Faucet Industries Inc. manufactures faucets in a small manufacturing facility. The faucets are made from zinc. Manufacturing has 60 employees. Each employee presently provides 36 hours of labor per week. Information about a production week is as follows:

Standard wage per hr.                                                                       $18.00

Standard labor time per faucet                                                          12 min.

Standard number of lbs. of zinc                                                         0.80 lb.

Standard price per lb. of zinc                                                                $1.25

Actual price per lb. of zinc                                                                    $1.40

Actual lbs. of zinc used during the week                                           10,200 lbs.

Number of faucets produced during the week                                      12,000

Actual wage per hr.                                                                            $18.75

Actual hrs. per week                                                                        2,160 hrs.

Instructions

Determine

(a) the standard cost per unit for direct materials and direct labor;

(b) the price variance, quantity variance, and total direct materials cost variance; and

(c) the rate variance, time variance, and total direct labor cost variance.

Solution Preview :

Prepared by a verified Expert
Cost Accounting: Determine the total direct materials cost variance
Reference No:- TGS02121363

Now Priced at $20 (50% Discount)

Recommended (91%)

Rated (4.3/5)