Determine the Process Capability Index of the three processes given below and determine whether the processes are capable or not.
Process Mean Variance Lower Specification Limit Upper Specification Limit
1 7.5 0.01 7.0 8.0
2 4.6 0.0144 4.3 4.9
3 6.0 0.0196 5.5 6.7