Jobs arrive at a machine shop according to a Poisson distribution at the rate of R jobs per week. An automatic machine represents the bottleneck in the shop. It is estimated that a unit increase in the production rate of the machine will cost C1 per week.Delayed jobs normally results in lost business , which estimated to be C2 per job per week. Determine the optimum production rate?