Determine the optimal daily production mix


Alumco manfactures aluminum sheets and aluminum bars . the maximum production capacity is esstimated at either 800sheets or 600 bars per day,the maximum daily demand is 550sheets and 560 bars,theprofit per ton is$40per sheet and $35 per bar Determine the optimal daily production mix

Request for Solution File

Ask an Expert for Answer!!
Operation Management: Determine the optimal daily production mix
Reference No:- TGS090782