An efficiency study showed that the rate at which the average worker assembles products t hours after starting work can be modeled by the function
f ( t ) = - t 2 + 12 t + 15 , where 0 ≤ t ≤ 4
Determine the number of units the average worker can assemble during the fourth hour that s/he works during a shift.
a) 45 units
b) 8 units
c) 135 units
d) 2 units
e) 132 units
f) None of the above.