Determine the main business requirements and consequently


Assignment: Train line Reservation System

You will conduct a systems analysis project by performing 3 phases of SDLC (planning, analysis and design) for a small (real or imaginary) organization. The actual project implementation is not required (i.e. No coding required.) You need to apply what you have learned in the class and to participate in the team project work.

Deliverables

This project should follow the main steps of the first three phases of the SDLC (phase 1, 2 and 3). Details description and diagrams should be included in each phase.

Part 1: Planning Phase

Under this section, include the following

• Adopt an SDLC development methodology
• Develop a work plan (Gantt chart)

Part 2: Analysis phase

In this section, you are required to determine the main business requirements; consequently, the following must be included:

• Create Use Cases
• Model Processes (Data Flow Diagramming)
• Model data (ER modeling)

Part 3: Design phase

Under this section, include the following:

• Select an architecture design
• Class Design Diagram.

Format your assignment according to the following formatting requirements:

1. The answer should be typed, double spaced, using Times New Roman font (size 12), with one-inch margins on all sides.

2. The response also include a cover page containing the title of the assignment, the student's name, the course title, and the date. The cover page is not included in the required page length.

3. Also Include a reference page. The Citations and references should follow APA format. The reference page is not included in the required page length.

Solution Preview :

Prepared by a verified Expert
Computer Engineering: Determine the main business requirements and consequently
Reference No:- TGS02957452

Now Priced at $60 (50% Discount)

Recommended (90%)

Rated (4.3/5)