Assignment Project Risk
Instructions
Risk Matrix
As a project manager for this company, you are to analyze the risks associated with the project. Risks should be identified and defined as cost, probability, impact, and mitigation plans for each risk. Below, you are to provide a risk assessment for the project based on the criteria and template provided.
• Identify and name at least three risks and name them (risk name).
• Determine the expected costs for each named risk.
• Provide expected costs for each of the name risks using clear 2 examples.
• Include factored risk value (should automatically calculate using the Risk Assessment Matrix template 1).Determined risk using clear examples.
• Determine the risk impact to project (using the drop-down menu in the Risk Assessment Matrix template 2).
• Provide the Risk Mitigation Plan.Determined the impact of risk on the project for each named risk using 2 examples.
• Determined risk end date for each named risk using clear examples.
Format your assignment according to the following formatting requirements:
1. The answer should be typed, double spaced, using Times New Roman font (size 12), with one-inch margins on all sides.
2. The response also includes a cover page containing the title of the assignment, the student's name, the course title, and the date. The cover page is not included in the required page length.
3. Also include a reference page. The Citations and references should follow APA format. The reference page is not included in the required page length.
Attachment:- Risk-Assessment-Matrix.rar