Electric power is to be generated in a hydroelectric power plant that receives water at a rate of 70 m^3/s from an elevation of 65 m using a turbine-generator system, with an efficiency of 85%. When frictional losses in piping are discarded, determine the electrical output of this plant. (Assume the density of water be 1000 kg/m^3)